Journey with Confidence RV GPS App RV Trip Planner RV LIFE Campground Reviews RV Maintenance Take a Speed Test Free 7 Day Trial ×
 
 

Go Back   5thWheelForums.com > 5th Wheel Brand Forums > DRV | Formerly Doubletree
Click Here to Login
Register FAQ Community Calendar Today's Posts Log in

 
 
Thread Tools Search this Thread Display Modes
 
Prev Previous Post   Next Post Next
Old 07-24-2012, 03:57 PM   #1
joelnlori
Junior Member
 
Join Date: Jul 2012
Posts: 2
Send a message via AIM to joelnlori
New to forum/new to DRV/ have problem with clearance

Hi, I have recently purchased a 2010 Mobile Suites, 36'. Towing with a 2012 GMC dually. I have trail air center point suspension and trail air pin box. My reese hitch is at the next to lowest position. 6 inch clearance to bedrail, but I still dinged my bed rail with the back of kingpin turning left with the right wheel low...won't put my self in that position again... BUT I am towing about 3 inches nose high. Pin box seems to be extended as low as possible. There is one more hole in shackle to raise one inch. I can raise hitch 3 inches but then would really be nose high. Prefer not to lower truck, requires specialty shop and not sure what effect that could have on warranty. Moryde IS will raise trailer. but was wanting to put that off a couple years. Changing beds is option, but I am about tapped on startup costs (too tight says Lori). Any other suggestions? ONE more?... if lowering the springs to bottom shackle hole, do I need to also lower the center point to the next lower hole also? THANKS
joelnlori is offline   Reply With Quote
 


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

» Featured Campgrounds

Reviews provided by

Powered by vBadvanced CMPS v3.2.3

All times are GMT -5. The time now is 03:51 AM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
×