Journey with Confidence RV GPS App RV Trip Planner RV LIFE Campground Reviews RV Maintenance Take a Speed Test Free 7 Day Trial ×
 
 

Go Back   5thWheelForums.com > 5th Wheel Brand Forums > DRV | Formerly Doubletree
Click Here to Login
Register FAQ Community Calendar Today's Posts Log in

Reply
 
Thread Tools Search this Thread Display Modes
 
Old 05-09-2019, 09:06 AM   #1
Cummins12V98
Senior Member
 
Join Date: Feb 2013
Location: on the road
Posts: 1,188
I would like to see how you finished the slide out edges. Could you post a closer pic of an outside corner.

Thanks!
__________________
2015 RAM LongHorn Dually Air ride Aisin 4:10's

2016 MS 39TKSB3 "Highly Elited"
Cummins12V98 is offline   Reply With Quote
Old 06-02-2019, 04:25 PM   #2
stanleyz
Senior Member
 
stanleyz's Avatar
 
Join Date: Sep 2011
Location: Sharpsburg (ATL) GA
Posts: 196
Quote:
Originally Posted by Cummins12V98 View Post
I would like to see how you finished the slide out edges. Could you post a closer pic of an outside corner.

Thanks!
Sorry I didn't see this. I'll take you a pic and post it. If you look up Mortonsonthemove they have a youtube video on it and I kind of copied them. The edge of the door side slide was the first piece laid. Used glue and left about two inches or so hanging over the edge so when it closed there was coverage over the floor. Then went from there to the rest of the slide out.
__________________
JUST ANOTHER DEPLORABLE
stanleyz is offline   Reply With Quote
Old 06-04-2019, 04:56 PM   #3
stanleyz
Senior Member
 
stanleyz's Avatar
 
Join Date: Sep 2011
Location: Sharpsburg (ATL) GA
Posts: 196
Quote:
Originally Posted by Cummins12V98 View Post
I would like to see how you finished the slide out edges. Could you post a closer pic of an outside corner.

Thanks!
The first piece I laid was the outer edge of the slide. I over lapped the edge by about 3 inches so it would cover the plastic edge when the slide is out. Just cut the ends like the carpet was cut. I glued these pieces. Then I worked in to the slide out wall completing that first. I laid the floor from the edge of the plastic and then when done covered the plastic with a border of trim. When it was all done everything leveled up pretty well. There is a little indent just in from the edge of the slide. When the carpet was there that indent was filled with a board so the carpet actually had a little hump there. I just laid across it as I worked my way in from the slide edge. It worked out OK. I'm not explaining it to my satisfaction but if you will watch the Mortonsonthemove you tube it will explain everything.

Somebody asked me how long it took. I'm 76 so my work days are getting shorter by the year. I would say i could have done it in a day and a half or one long day. I think we spread it out over three or four days and a couple rounds of golf. Stuff is easy to cut, just score it with a cutter and bend. Hope this helps someone.
Attached Images
File Type: jpg IMG_9123.jpg (138.4 KB, 20 views)
File Type: jpg IMG_9125.jpg (89.3 KB, 19 views)
File Type: jpg IMG_9130.jpg (175.8 KB, 20 views)
File Type: jpg IMG_9128.jpg (191.7 KB, 17 views)
__________________
JUST ANOTHER DEPLORABLE
stanleyz is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

» Featured Campgrounds

Reviews provided by

Powered by vBadvanced CMPS v3.2.3

All times are GMT -5. The time now is 10:33 AM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
×