Generator transfer switch

I just purchased a 2021 mobile suite 39dbrs3 and it is generator prepped. My question is does the Prep mean that there is a auto transfer switch installed so when I put aGenerator in it will be auto transfer capable My motorhome worked this way. I take delivery of this unit next week.
Thanks
Smitty
__________________

Smitty082261 is offline   Reply With Quote
Old 10-12-2020, 11:36 PM   #2
wingnut60
Site Team
 
Join Date: Sep 2005
Location: Where we park it
Posts: 2,785
That should be the way it will work. But probably you need to know just how to connect in the J-box on side of the generator box. Do you have the hour meter and start/stop switch already in the control cabinet? If not, will need the wiring run.
And, welcome to the forum.
__________________

__________________
2016 Tiffin 40 QBH
2015 38RSSA, traded
2005 TK3 #1869, 10 yrs of memories,
2017 F450 KR--one more Ford is it
2009 F450 4x4-died; 2010 F450-retired
wingnut60 is offline   Reply With Quote
Old 10-13-2020, 11:12 AM   #3
porkchop
Senior Member
 
Join Date: Sep 2010
Location: Nebraska
Posts: 337
If you have the "prep" that means all the necessary stuff is there.. Just add gen and go.

Bill
porkchop is offline   Reply With Quote
Reply

Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

» Featured Campgrounds

Reviews provided by

Powered by vBadvanced CMPS v3.2.3

All times are GMT -5. The time now is 10:24 PM.


Powered by vBulletin® Version 3.8.8 Beta 4
Copyright ©2000 - 2020, vBulletin Solutions, Inc.
×