View Single Post
Old 08-04-2018, 08:41 PM   #6
porthole
Senior Member
 
Join Date: Jun 2009
Posts: 455
Quote:
Originally Posted by Mtntrek View Post
they're still just vented holding tanks. The hotter they get the riper they smell.
One of the key points to minimize orders is good venting. I didn't think to check vent pipe runs when I was at the factory. But, I only have one vent coming through the roof. I also haven't checked to see if the sinks are vented to a common stack or just using a Studor valve. Either way, a single 1.5" vent stack with multiple turns and bends is at best minimal venting.
__________________
Thanks,
Duane
2019 DRV MS 39DBRS3 ---> Flexible Flyer
2020 F-450
porthole is offline   Reply With Quote