Thread: Solar Install
View Single Post
Old 10-09-2018, 09:18 AM   #12
porthole
Senior Member
 
Join Date: Jun 2009
Posts: 455
Quote:
Originally Posted by Chad Heiser View Post
The other thing I had DRV do for me was run all the 12 volt wiring to one compartment (the door side battery compartment) rather than splitting it between the two battery compartments like they normally do with their standard large inverter installation.
Based on your suggestions that is one of the things I requested along with proper SAT coax wiring.
Neither got done.

I am currently in the process of doing the electric stuff. I guess one good thing about they way the wire in the big inverter. I had ordered 10' each of red and black 4/0 wire. There was enough 4/0 in the rig that I could have saved the money. Even though I am moving the batteries (5) to the front closet and replacing all the interconnecting cables, I still have about 20' of 4/0 left (10 & 10).
__________________
Thanks,
Duane
2019 DRV MS 39DBRS3 ---> Flexible Flyer
2020 F-450
porthole is offline   Reply With Quote